Quote:
Originally Posted by 4-20sx
Lol so you decided to build the bottom end. Good luck bud. I still got my vh sitting on the stand.
|
well i have all the parts already
clevite main / rod / and thrust bearings.
ARP Rod bolts
Hastings rings
and obviously the heads and cams already assembled with super tech valve springs ad titanium retainers.
Dropping the bottom end off at the machine shop on monday so it shouldn't be too long, I'm thinking about a week at the machine shop then another week to assemble and put it back in. But you know how that is.