Thread: 450sx part 2
View Single Post
Old 10-21-2012, 10:09 PM   #653
gsracer
Zilvia FREAK!
 
Join Date: Mar 2003
Location: Miami
Age: 41
Posts: 1,590
Trader Rating: (7)
gsracer has a reputation beyond reputegsracer has a reputation beyond reputegsracer has a reputation beyond reputegsracer has a reputation beyond reputegsracer has a reputation beyond reputegsracer has a reputation beyond reputegsracer has a reputation beyond reputegsracer has a reputation beyond reputegsracer has a reputation beyond reputegsracer has a reputation beyond reputegsracer has a reputation beyond repute
thanks I'm pretty obsessive so that helps.

We shall see how long the machine shop takes, they are very reputable and they told me 3-5 business days. I have yet to have any shop local to me ever keep a time table. Thats why I'm driving an 1.5 hr for this one. Time will tell.

I want to have it running by the end of the month.
__________________
ANTI-STRETCH NAZI
Vortech Supercharged Vh45de S14 V8nissans.com
gsracer is offline   Reply With Quote