Quote:
Originally Posted by Aaj2k5
Yep - almost all of the crappy work is done - 95% of the 38 year old sludge is gone. Then I can get into actually building the damn thing instead of having no motivation to grind/sand in the winter
Atutt is going to be doing:
- 3"x3" Front Frame rails with bolt holes for S30 subframe, S14 TC brackets/sway bar.
- 1"x3" Mid frame rails full length of floors rather than 2/3 length 20ga shitmetal.
- R34 GTR Subframe mount for the rear with box setup for future cage.
- S30 -> S13 Coilover camber plates welded in.
Some other fancy things.
|
he just gave that part to me.
Once my street is back open and I can get the damn material truck down it, the rails can be started.