I did a little more on my day off for Columbus Day.
after i got it started and running i developed a pretty big power steering leak. I had to pull most of the front of the motor apart to add a restrictor valve to the pump.
while i was at it, i pulled the manifolds off and wrapped them. with the manifolds generating a ton of heat and very close to my relocated coils, i figured it wasn't a bad idea. i wanted to do the crossover as well, but ran out. each manifold took 50ft of 1" wrap
Next I put everything back together, drained the oil added the compressor and center housing, oil feed and drain lines, wastegate and vacuum lines. Engine bay is 98% done, all i have left to do looming a section of the engine harness and all should be good. just need to bleed the brakes and clutch and finish the interior.